4MOST - 4-metre Multi-Object Spectroscopic Telescope
4-m Multi-Object Spectroscopic Telescope
4MOST

4MOST Cassegrain Cable Wrap arrives in Potsdam

by Joe Liske on 2021-06-18

The Project Manager, Joar Brynnel, reports that on 2021-06-16 the 4MOST Cassegrain Cable Wrap (CaCW) was delivered to the AIP in Potsdam. The unit was transported from the manufacturer Kinkele in Bavaria on an over-wide transport truck. After unloading and unpacking in the 4MOST integration hall, the CaCW (white structure in the photos below) was mounted in its orange handling frame. Everything went smooth and without incidents.